Advanced Planning Baseline Schedule with Primavera P6 &Excel
Learn how to create a detailed baseline schedule using Oracle Primavera and Excel power query. This course provides step-by-step guidance on activities, budget cost estimation, resource allocation, and more. With real project case studies and open-source files, you can apply these techniques to your own projects. Suitable for planning engineers, managers, and anyone with basic construction knowledge. Save time and effort with smart planning techniques. Please note, this course does not cover project time schedule updates, EOT, or claims.
Step by step Planning Technique to create a detailed baseline schedule using Oracle Primavera latest version and Excel power excel power queryCreate activities, estimate the budget cost and resources in Excel and smartly export to Primavera P6Develop project cash flow and manpower histogram, shop drawings log, and procurement log.Real project case study to create a baseline schedule from scratch.All Project case study files will be shared with you open source so you can use on your next project.Real project case study course for an intermediate-level construction planning using Oracle Primavera p6 and Microsoft Excel.You need to have basic knowledge of Planning Concepts and Oracle Primavera P6 software. Furthermore, you need to have Microsoft Office 2016 or later or Microsoft Office 365.We will start from scratch with a project Bill of quantities BOQ and a set of drawings to create the following:1-Course introduction.2- Read project BOQ.3- Create Project Data Loading.4- Read Drawings and add floors to data loading.5- Activity list and WBS.6- Cost Loading.7- Resource Loading.8- Load Cost and Resources to P6.9- Estimate Activities Duration.10- Activities Relationships.11- Shop Drawings.12- Materials Procurement.13- Cash flow and Manpower Histograms.We will be using the smart Planning Technique using Microsoft Power Query and Oracle Primavera Import and Export to facilitate the Planning Process and provide a Detailed Baseline Schedule with minimal efforts saving 100’s working hours.The course includes all the project documents and the final Baseline documents (Excel and XER files) as open-source for your use so you can modify and use them on your next project.This is a practical case study project where the instructor will open the files and start working on a real project case study doing the Baseline Schedule using Oracle Primavera P6 and Microsoft Excel advanced techniques. This course scope is NOT including the Project Time Schedule Update or Revised / Recovery schedule and does NOT involve Extension of Time EOT and Claims.Who this course is for:Planning Engineers, Planning Managers, Construction Managers.Anyone with basic construction / planning knowledge and want to learn planning
User Reviews
Be the first to review “Advanced Planning Baseline Schedule with Primavera P6 &Excel”
You must be logged in to post a review.


There are no reviews yet.