Primavera P6 latest edition Training Course and Tutorial

- 43%

0
Certificate

Paid

Language

Level

Beginner

Last updated on February 5, 2023 4:02 am

Learn Primavera P6 Overview Course and Tutorial – Practical Training in a live software with Technical Support. Install, build schedules, add resources, and analyze critical paths. Suitable for all levels – beginners, graduates, and professional engineers.

Add your review

What you’ll learn

  • Learn Primavera P6 Overview Course and Tutorial-Practical Training in a live software with a Technical Support
  • How to install Primavera P6
  • How to build a solid schedule in Primavera P6
  • Adding resources, Printing layouts, and critical path analysis

Learn Primavera P6  Overview Course and Tutorial

1. Lecture 1 link:

lecture 1 explain P6 History, P6 Features, P6 Tools, P6 Interface, Critical Path, and CPM technique and terms

2. Lecture 2 Link:

How to download and Install Primavera P6

How to download and install Primavera P6  and Database Configuration on your laptop and be an expert in Primavera

• In this Lecture:

• Installation Guideline step by step with a screenshot

• Database Configuration

3. Lecture 3

Create Project and WBS Details

4. Lecture 4 in Oracle Primavera P6 –Activities:

Adding activities and Creating Links

5. Lecture 5 in Oracle Primavera P6 –Resources:

Definition of resources, types and details of the resources addition – Measurement units – Prices – Resources codes – How to classify resources to its workers, tools and equipment on the Primavera software last version

How to create Cost accounts for activities and also resources –Adding units to resources –assigning resources and unites and calculate Costs from Units

6. Lecture 6 in Oracle Primavera P6 –Create Baselines

Create Baseline the Baseline or Target Schedule provides a point of reference on which to measure and control the underway project. Create a Baseline copy of the schedule before the first update. This will be the target against which the project’s cost, schedule, and performance are tracked. Assign each baseline a category to define its purpose (i.e. initial planning baseline, what-if project plan baseline, mid-project status baseline, monthly update comparison baseline). Categories are created under the Admin menu, Admin Categories, Baseline Types.

7. Lecture 7 in Oracle Primavera P6 Progress Update

Update the schedule regularly and compare it to the baseline to ensure that resources are being used effectively, project costs are being monitored against the original budget, that there is a knowledge of actual duration and costs in order to initiate contingency plans if  necessary.

Ask the following questions when updating:

· What information needs to be collected to update the project and what method(s) will be used to collect information?

· Who will gather the necessary information used for the project update?

· How often should the project be updated?

· Are resources local or offsite?

· Who will need to see the results of the update and when are these results needed?

· What types of information will be generated after each update in order to communicate progress before the next update period?

Who this course is for:

  • All Levels
  • Beginners, Graduates, and professional Engineers

User Reviews

0.0 out of 5
0
0
0
0
0
Write a review

There are no reviews yet.

Be the first to review “Primavera P6 latest edition Training Course and Tutorial”

×

    Your Email (required)

    Report this page
    Primavera P6 latest edition Training Course and Tutorial
    Primavera P6 latest edition Training Course and Tutorial
    LiveTalent.org
    Logo
    LiveTalent.org
    Privacy Overview

    This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.